ELM Building Service Engineers Ltd.

Superdrug
David Lloyd Leisure
MacDonald Hotels
Holiday Inn Group
Other Work











MacDonald Hotels

Dunkenhalgh HFC 5 bed extension
1. Installation of several power sockets to power small appliances such as hair dryers, drinks dispensers etc.
2. Installation of lighting to lower ground floor areas.
3. Design and installation of fire alarm system to BS5839. System comprising of sounder bases , carbon monoxide detectors, smoke detectors, electronic sounders and xenon flashing beacons.
4. Design and installation of voice and data IT infrastructure.
5. Installation of speakers in communal areas and each room to allow distribution of music controlled from reception area.
6. Installation of toilets, basins and showers to female changing areas.
7. Installation of showers and other accessories to disabled changing area.
8. Installation of toilet, basin, urinal and showers to male changing areas.

Berystede Hotel, Ascot
1. Installation of new gas and water main to new health and fitness centre.
2. Installation of hot and cold water systems to new health and fitness centre.
3. Installation of domestic hot water service.
5. Design and installation of air conditioning and ventilation system to new health and fitness centre.

Bath Spa Hotel, Bath
1. Installation of 315A mains distribution and sun circuits.
2. Design and installation of fire alarm system to BS5839.
3. Installation of P.A./background music and tv system to treatment rooms and gym area.
4. Installation of stand-alone nurse call system to disabled shower and treatment rooms.
5. Installation of CCTV and intruder alarm systems.
6. Design and installation of lighting system and emergency lighting system.